Kawamura, Naritoshi
MOPM093
Positron contamination in the muon beam at the J-PARC's surface muon beamline (S-line)
542
The surface muon beamline at J-PARC provides high-intensity muon beams that are essential for advanced materials science research, particularly in techniques such as muon spin rotation/relaxation (μSR). However, positron contamination in the beam poses a significant challenge by introducing background noise that affects the measurement precision. Therefore, achieving high-purity muon beams is critical for improving experimental reliability and accuracy. In this study, the G4beamline Monte Carlo simulation toolkit was employed to model the transport of muons and positrons from the production target through the beamline. The system includes a momentum and charge-based separator followed by a collimating slit. While the current slit configuration effectively suppresses positrons, it also causes substantial muon loss of approximately 76%, which significantly reduces the usable muon flux for downstream applications. To address this issue, a detailed investigation into slit size was performed. The results indicate that modest adjustments to the slit aperture size can improve the muon-to-positron ratio while retaining a greater fraction of the muon beam. These results provide valuable guidance for optimizing beamline performance and improving the quality of muon-based experiments at J-PARC.
  • P. Jaikaew, I. Watanabe, T. Adachi
    RIKEN Nishina Center
  • C. Thongbai, S. Rimjaem
    Chiang Mai University
  • N. Kawamura, P. Strasser
    High Energy Accelerator Research Organization
Paper: MOPM093
DOI: reference for this paper: 10.18429/JACoW-IPAC2025-MOPM093
About:  Received: 28 May 2025 — Revised: 02 Jun 2025 — Accepted: 05 Jun 2025 — Issue date: 05 Nov 2025
Cite: reference for this paper using: BibTeX, LaTeX, Text/Word, RIS, EndNote
TUPB024
Simulations of magnetic field effects on 3-GeV proton beam brought by magnets for muon beam in future proton beam transport line of J-PARC
1010
A high-power 3-GeV proton beam from a rapid cycling synchrotron (RCS) is transported to targets for muon and neutron production at Materials and Life Science Experimental Facility (MLF) by a 3-GeV RCS to Neutron facility Beam Transport (3NBT) line in J-PARC. Recently, the design power of 1 MW has been achieved, which has initiated a future plan of MLF second target station (TS2). For the future plan, design studies have been started for a new beam transport line to the TS2 target, which works as a source for both muon and neutron. In this study, 3-GeV proton beam transport is simulated in the vicinity of the TS2 target, where a bending magnet for muon separation and a capture solenoid are aligned. In this presentation, we report magnetic field effects on the proton beam brought by those magnets and correction of the effects.
  • Y. Yamaguchi, Y. Kondo, S. Shinozaki, T. Takayanagi, S. Meigo
    Japan Atomic Energy Agency
  • H. Fujimori, N. Kawamura
    High Energy Accelerator Research Organization
Paper: TUPB024
DOI: reference for this paper: 10.18429/JACoW-IPAC2025-TUPB024
About:  Received: 07 Apr 2025 — Revised: 02 Jun 2025 — Accepted: 03 Jun 2025 — Issue date: 05 Nov 2025
Cite: reference for this paper using: BibTeX, LaTeX, Text/Word, RIS, EndNote